Plastering Calculator
Wall Dimensions
ft
ft
Plaster Settings
12mm - Internal walls | 15mm - External walls | 20mm - External rough walls
1:4 - High strength | 1:5 - Standard | 1:6 - Economy grade
1 Coat - Standard finish | 2 Coats - Premium smooth finish
Area Calculations
Wall Area (Sq Ft)
100 sq ft
Wall Area (Sq M)
9.29 sq m
Plaster Volume
0.111 m³
Dry Volume
0.148 m³
Material Requirements
Cement Bags
1 bags
(50kg each)
Cement Weight
35.59 kg
Sand Required
4.36 cft
(197.7 kg)
Water Required
7.12 L
Cost Estimate
Total Estimated Cost
₹6,619
Cement
₹400
Sand
₹218
Labor
₹6,000
Cost Breakdown
How We Calculate Plastering Requirements
Step 1: Area Calculation
We calculate the wall area by multiplying Length × Height, then convert to square meters for volume calculations.
Wall Area = 10 × 10 = 100 sq ft = 9.29 sq m
Step 2: Plaster Volume
Plaster volume = Wall area × Thickness × Number of coats. Using 12mm thickness for 1 coat.
Volume = 9.29 × 0.012 × 1 = 0.111 m³
Step 3: Dry Volume Adjustment
We add 33% to the wet volume to get the dry volume of materials needed. This accounts for voids and compaction.
Dry Volume = 0.111 × 1.33 = 0.148 m³
Step 4: Material Distribution
Based on the cement:sand ratio (1:5), we distribute the dry volume proportionally:
- Cement: 1 bags (35.59 kg) @ ₹400/bag
- Sand: 4.36 cubic feet (197.7 kg) @ ₹50/cft
- Water: 7.12 liters (20% of cement weight)
- Labor: 100 sq ft @ ₹60/sq ft
Key Assumptions
- • Cement density: 1440 kg/m³
- • Sand density: 1600 kg/m³
- • Water-cement ratio: 0.2 (20% by weight)
- • Dry volume factor: 1.33 (33% increase)
- • Labor cost: ₹60 per sq ft
- • Material costs: Cement ₹400/bag, Sand ₹50/cft
Pro Tips
Thickness Selection:
- • 12mm - Internal walls, smooth surfaces
- • 15mm - External walls, moderate exposure
- • 20mm - External rough walls, heavy exposure
- • Check local building codes
Best Practices:
- • Wet the wall before plastering
- • Use clean, fine sand
- • Apply in thin, even coats
- • Cure properly for 7-14 days
Popular Construction Calculators
Cement Calculator
Brick Calculator
Sand Calculator
Concrete Calculator
Paint Calculator
Plastering Calculator
Steel TMT Calculator
Tile Calculator
Construction Cost Calculator
Plot Area Converter
Build with confidence
Accurate material calculations for your construction projects